ESD workbenches for factories in Binh Duong, Dong Nai and Long An
PRIMEAG manufactures ESD workbenches at its Thu Duc workshop, Ho Chi Minh City, then delivers and installs them at factories in Binh Duong, Dong Nai and Long An within 7–10 days of order confirmation, with free delivery and installation for orders over VND 20 million. Every lot comes with a report of actual resistance readings.
See the ESD workbench price list 2026 (from-prices excl. VAT, with accessories).

Delivery and installation by province
| Area | Lead time (standard designs, after confirmation) | Delivery + installation fee |
|---|---|---|
| Binh Duong | 7–10 days | Free for orders over VND 20 million |
| Dong Nai | 7–10 days | Free for orders over VND 20 million |
| Long An | 7–10 days | Free for orders over VND 20 million |
| Tay Ninh, Ba Ria – Vung Tau, other provinces | Agreed per order | Freight and installation schedule quoted with the quotation |
New designs need extra time for drawing approval (10–15 working days); orders over 20 benches take 2–3 weeks. The exact lead time is stated on the quotation.
Where the PRIMEAG team has worked
The PRIMEAG team has delivered about 40 projects in Binh Duong, 30 in Dong Nai and 15 in Ho Chi Minh City — mostly FDI electronics, component and logistics facilities. Customer names are kept confidential; photos of selected projects are on the PRIMEAG Projects page.
Most recent project (10/2026): 10 mixed ESD workbenches (aluminium profile frames, with upper shelves and flat benches) delivered to a factory in Vietnam – Singapore Industrial Park II (VSIP II), Binh Duong — benches wrapped in protective film at our workshop and installed on site on the day of delivery.


Process for factories in the provinces
- Send dimensions, quantity, accessories (upper shelf, lights, sockets) or a layout photo via Zalo — quotation within 30 minutes, with a drawing for approval.
- Manufactured at the Thu Duc workshop; every bench is resistance-tested with a TR1800 meter before leaving the workshop.
- Delivery and installation at your factory, ground cord connection, and on-site re-test if the factory requests it.
- Handover of report PAG-QA-ESD-01 and VAT invoice (0% for export processing enterprises (EPE) — PRIMEAG handles the customs declaration).
Two bench types and reference prices
| Frame type | Best for | Price from (ex 8% VAT) |
|---|---|---|
| Plastic-coated steel pipe Φ28 + DND joints | Lines that often change layout, warehouses, assembly | VND 2,000,000 (600×800×1950 mm) VND 2,500,000 (1200×750×1950 mm) |
| Aluminium profile 40×40 | SMT, cleanrooms, test stations, where lights/sockets are needed | VND 4,500,000 |
Dimension convention: worktop length × worktop width × height to the highest point (top of upper shelf). Price varies with worktop, number of shelf levels, lights and sockets.
Resistance, worktop and ground cord specifications: see ESD workbenches – specifications and test report. 3-year frame warranty; 12 months on ESD worktop, lights and sockets.
Frequently asked questions
How soon can a factory in Binh Duong get its ESD benches?
Standard designs are delivered and installed within 7–10 days of order confirmation. New designs or orders over 20 benches have a separate lead time stated on the quotation.
Is there a delivery charge to Dong Nai or Long An?
Delivery and installation are free for orders over VND 20 million in Binh Duong, Dong Nai and Long An. For smaller orders the fee is stated with the quotation.
Does PRIMEAG deliver to Tay Ninh and Ba Ria – Vung Tau?
Yes. Freight and installation schedule are agreed per order.
How much does a steel pipe ESD workbench cost?
From VND 2,000,000 for a 600×800×1950 mm bench and from VND 2,500,000 for a 1200×750×1950 mm bench (worktop length × worktop width × height to top of shelf), ex 8% VAT.
Are the benches resistance-tested after installation at the factory?
Yes. Benches are tested before leaving the workshop and re-tested after installation if the factory requests it; readings are recorded in report PAG-QA-ESD-01.
Quotation within 30 minutesFree on-site ESD resistance test
Updated: 21/10/2026 — PRIMEAG Technical Team
