PRIMEAG manufactures workbenches, trolleys and racks for electronics plants, logistics warehouses and FDI factories in Vietnam, and supplies ESD and cleanroom consumables. This page summarizes what we actually deliver: output, lead times, warranty, ESD quality control and completed projects, so purchasing and engineering teams have what they need to evaluate a supplier.
- 1,500 units/month (workbenches, trolleys, racks) – in-house workshop, backed by subcontract partners and seasonal labor on large projects.
- 5–7 days for standard workbenches, racks and trolleys built to custom dimensions; 10–15 days for new designs (including drawing approval); stocked consumables delivered in 24–48 hours (HCMC, Binh Duong, Dong Nai); made-to-order items in 3–7 working days.
- 3-year warranty on frames; 1 year on ESD worktops, electrical fittings and casters.
- Lot-by-lot ESD resistance testing, shipped with test reports, CO/CQ and manufacturer test certificates.
See workshop photos, the cut – assemble – ESD-test process and our pipe and joint sourcing on the PRIMEAG manufacturing capability page.



Production capacity
| Item | Capacity |
|---|---|
| Output | About 1,500 units/month, including workbenches, trolleys and racks |
| Production model | Built in PRIMEAG’s own workshop; large or urgent projects are backed by subcontract partners and seasonal labor |
| Product lines | Lean pipe workbenches (plastic-coated steel pipe, Φ28), aluminium profile workbenches, 304 stainless steel benches, FIFO flow racks, pallet racks, trolleys, PCB racks |
| Design | To the customer’s dimensions, line layout or drawings; technical drawings and BOM issued before production |
| Lead time | Standard workbenches, racks, trolleys: 5–7 days. New designs: 10–15 days. Projects of several dozen to several hundred workbenches: scheduled in phases |
| Installation | Our own crew installs on site; phased deliveries when the customer is running lines in parallel |
Project workflow
- Survey: we collect the layout, photos of the current site, ESD requirements, loads and number of stations.
- Drawings and BOM: drawings, bill of materials and quotation sent for customer approval.
- Sample: a sample workbench or trolley is built on request for high-volume projects.
- Production: to the approved drawings; worktops and ESD materials are resistance-tested lot by lot.
- Delivery and installation: installed at the plant, grounded and inspected together with the customer.
- Acceptance: handover of ESD test reports, CO/CQ, user instructions and warranty.
Warranty and spare parts
| Component | Warranty |
|---|---|
| Workbench, rack and trolley frames (plastic-coated steel pipe, aluminium profile, stainless steel) | 3 years |
| ESD worktops | 1 year |
| Electrical fittings (lights, power sockets, wiring) | 1 year |
| Casters (all types) | 1 year |
Plastic-coated steel pipe and aluminium profile systems are assembled with bolted joints, so individual parts can be replaced without scrapping the whole workbench. PRIMEAG supplies lean pipe, joints and accessories as well as industrial casters and ESD casters for replacement, expansion or future layout changes.
ESD quality control
Worktops, mats, trays, bins and other ESD materials are resistance-tested lot by lot with a surface resistance meter against the limits of ANSI/ESD S20.20 and IEC 61340-5-1. Every lot ships with a test report; imported goods also come with CO/CQ and the manufacturer’s test certificates. For test methods and pass ranges, see our guide on resistance testing for ESD material acceptance.



Completed projects
| Customer (name withheld) | Period | Scope |
|---|---|---|
| Taiwanese-invested electronic components plant, Da Nang | 2024–2025 | About 500 ESD workbenches with lights, power sockets and grounding cords; delivered in 4 phases |
| US-invested FDI plant, Can Giuoc | 2025–2026 | 400 purpose-built trolleys |
| E-bike plant | 03/2026 | 50 trolleys with ESD decks |
| Electronics plant, Binh Duong | 06/2026 | Stainless steel air shower, 4 motors, 24 nozzles |
| Chinese-invested logistics and distribution center, Phu Tho | 07/2026 | 30 trolleys, 32 workbenches 1200×750, 6 workbenches 1500×1000, 5 stainless steel benches 1200×2400 |
| Singapore-invested e-commerce fulfilment hub, Ho Chi Minh City | 09/2026 | 50 workbenches 1200×750, 30 workbenches 1500×750, 4 stainless steel 304 benches 1200×2400; 10 days of production, 2 days of installation |
| Electronics plant, Binh Duong | 09/2026 | 1,000 ESD plastic trays 450×300×60 |
Project photos are on our Projects page. Customer references are provided on request, with the customer’s consent.
Service area
Office in Ho Chi Minh City; regular delivery and installation in Ho Chi Minh City, Binh Duong, Dong Nai and neighboring provinces; projects completed in Da Nang and Phu Tho. Company profile, catalogue and a sample ESD test report are sent on request when registering PRIMEAG as a new supplier.
Frequently asked questions
How many workbenches can PRIMEAG produce per month? About 1,500 units per month, including workbenches, trolleys and racks. PRIMEAG builds them in its own workshop and adds subcontract partners and seasonal labor for large projects.
What is the warranty on PRIMEAG workbenches? Workbench, rack and trolley frames carry a 3-year warranty. ESD worktops, electrical fittings and casters carry a 1-year warranty. Joints, pipe and casters are kept in stock for replacement.
How long does a custom-size workbench take? Standard workbenches, racks and trolleys built to custom dimensions take about 5–7 working days; new designs take 10–15 working days (including drawing approval). Projects of several dozen to several hundred workbenches are scheduled and delivered in phases.
Does PRIMEAG provide ESD test reports? Yes. ESD materials and worktops are resistance-tested lot by lot and shipped with a test report, plus CO/CQ and manufacturer test certificates for imported goods.
Email: info@primeag.vn · Phone/Zalo: +84 906 108 292
Written by the PRIMEAG engineering team
