PRIMEAG fabrication, installation and technical services
Besides supplying materials, PRIMEAG handles the jobs factories often need but few suppliers spell out: cutting to size, custom sizing and logo printing on ESD garments, building workbenches, racks and trolleys to drawing, installing anti-static (ESD) flooring, on-site ESD resistance testing and the paperwork for selling to export processing enterprises. Below is each service with lead time and cost so you can plan before asking for a quote.
- Area: Ho Chi Minh City, Binh Duong, Dong Nai, Long An; other provinces by agreement on freight and schedule.
- Quotation: within 30 minutes during working hours, Monday – Saturday, 8:00–17:00 (GMT+7). If an item is not available we tell you straight away.
- Prices: all prices on the website exclude 8% VAT. Customers with recurring orders get prices held for 6 months.
Send a requestMessage on Zalo OA
Service, lead time and cost
| Service | What we do | Lead time | Cost |
|---|---|---|---|
| Cutting ESD rubber mats, PVC film and strip curtains to size | Cut from full rolls to the length or width the factory needs (ESD rubber mat 1.2 m × 10 m, 0.8 / 1.0 m widths on request; PVC film in various thicknesses); bench mats pre-cut to bench size and supplied with a grounding snap | Made to order, 3–7 working days | Included in the goods price; any processing charge is shown on the quotation |
| Custom sizes, logo and employee-ID printing on ESD and cleanroom garments | Sewing sizes outside the standard size chart; printing or embroidering company logos and employee IDs/names on coveralls, smocks and ESD shirts | Made to order, 3–7 working days | Printing/embroidery is charged by quantity and colours, shown separately on the quotation |
| Technical drawings for workbenches, racks and trolleys | Send dimensions and requirements (load, lights, sockets, grounding, shelf levels); PRIMEAG sends a drawing for approval before production | Sent with the quotation | Free |
| Workbenches, racks and trolleys built to drawing | Plastic-coated steel pipe Φ28, aluminium profile, welded steel frames; ESD rubber mat worktops, with an ESD test report for each batch | Standard models 5–7 working days; new designs 10–15 days; orders over 20 benches 2–3 weeks | Per drawing; 3-year warranty on frames, 12 months on accessories |
| Delivery and installation at the factory | Transport, assembly, levelling and grounding in Binh Duong, Dong Nai, Long An and Ho Chi Minh City | 7–10 days after order confirmation | Outside Ho Chi Minh City, free delivery and installation for orders over VND 20 million |
| Heavy-duty warehouse (pallet) racking | Designed to the warehouse layout, manufactured, delivered and installed | Made to order, 2–3 weeks | Price includes delivery and installation |
| Anti-static PVC floor installation | 600×600 tiles, 2 or 3 mm thick, dissipative or conductive; laid with conductive adhesive and a 3 × 3 m copper tape grid to ground, resistance acceptance test on site | About 300 m² per day, out-of-hours work possible; small areas accepted | From VND 300,000/m² (materials + installation); 24-month materials warranty, 12-month workmanship |
| On-site ESD resistance testing | Every ESD item in use measured with a TR1800 meter; PDF report with photos and fixes for failing points. Details | Schedule confirmed the same day; visit within 3–5 working days; report 3–5 days later | Free, unlimited test points, no purchase required |
| ESD test report per batch | Report PAG-QA-ESD-01 measured with a calibrated meter, signed and stamped, for ANSI/ESD S20.20 audit files | Delivered with the batch | Free for goods bought under a supply contract |
| Selling to export processing enterprises | 0% VAT invoice; PRIMEAG files the on-the-spot import/export customs declaration. Documents needed | Declaration in 1–2 working days | Free paperwork for orders from VND 20 million |
| Matching the part you already use | Send a photo of the old item, the carton label or the brand code; PRIMEAG returns the exact code or an equivalent with datasheet | Within 30 minutes in working hours | Free |
Trading goods (mats, PVC film, tapes, gloves, cleanroom garments and accessories, ESD footwear…) are in stock and delivered in 24–48 hours in Ho Chi Minh City, Binh Duong and Dong Nai; only made-to-order processing follows the lead times above.
How to order a service
- Send a request by form, Zalo OA or email info@primeag.vn: the job, dimensions/quantity, factory address and preferred date.
- Get a quotation within 30 minutes with the lead time; for workbenches, racks and trolleys a drawing is attached for approval.
- Confirm by PO or email; PRIMEAG manufactures, delivers, installs and hands over with an ESD test report for anti-static goods.
Request a quotationSend dimensions, get a drawing
Office: Room 10, Mezzanine, Dai Thanh Binh Building, 911-913-915-917 Nguyen Trai, Cho Lon Ward, Ho Chi Minh City · Workshop: Thu Duc, Ho Chi Minh City
