Heavy-duty pallet racking and medium-duty shelving: specs, load ratings, 2026 prices
Heavy-duty warehouse racks are selective pallet racks served by forklift, rated 1,000–1,200 kg per level, 2.8–4.5 m high; medium-duty shelving carries 200–300 kg per level and is hand-picked. PRIMEAG draws the layout from your warehouse plan and delivers and installs at warehouses in Ho Chi Minh City, Binh Duong, Dong Nai and Long An; prices include delivery and installation for orders from VND 20 million, frame warranty 3 years.

6 configurations already produced, from-prices (excl. 8 % VAT)
| Configuration | H × L (clear) × D (mm) | Levels | Load / level | Upright (mm) | Beam (mm) | Support / deck | Bracing (mm) | Starter bay | Add-on bay |
|---|---|---|---|---|---|---|---|---|---|
| Heavy-duty, 4 levels, 17 mm plywood deck | 2,800 × 2,680 (2,500) × 1,000 | 4 | 1,000 kg | 60×90×1.5 | 50×100×1.5 | C34×1.1 + 17 mm plywood | 23×48×0.7 | VND 5,720,000 | VND 5,010,000 |
| Heavy-duty, 2 levels, 4.5 m high (pallets) | 4,500 × 2,680 (2,500) × 1,000 | 2 | 1,000 kg | 60×90×1.5 | 50×100×1.5 | C34×1.1 | 23×48×0.7 | VND 4,240,000 | VND 3,170,000 |
| Heavy-duty, 4 levels, 1,200 kg | 4,000 × 2,880 (2,700) × 1,100 | 4 | 1,200 kg | 60×90×1.7 | 50×120×1.5 | C34×1.3 (6 pcs/level) | 23×48×0.7 | VND 8,200,000 | VND 6,960,000 |
| Medium-duty, 4 levels, steel deck | 2,000 × 1,550 (1,500) × 600 | 4 | 300 kg | 60×50×1.1 | 30×80×1.3 | steel deck 0,7 mm | 13×40×0.7 | VND 2,800,000 | — |
| Medium-duty, 9 levels, steel deck | 2,600 × 1,600 (1,500) × 600 | 9 | 200 kg | 60×50×1.3 | 30×80×1.3 | steel deck 0,5 mm | 13×40×0.7 | VND 5,400,000 | — |
| Medium-duty, 9 levels, 3 uprights (1,200 deep) | 2,600 × 1,600 (1,500) × 1,200 | 9 | 300 kg | 60×50×1.3 | 30×80×1.3 + extra beam | steel deck 0,5 mm | 13×40×0.7 | VND 9,040,000 | — |
Dimensions are Height × Length (clear) × Depth. A starter bay has 2 frames; an add-on bay shares one frame with the adjacent bay and is cheaper. Material dimension tolerance ±5 %. Prices include delivery and installation in Ho Chi Minh City, Binh Duong, Dong Nai and Long An; orders under VND 20 million or more distant provinces are quoted with a separate fee.
Reference technical drawings
5 A3 drawings (isometric view, upright, beam, bracing, support, base plate and protector details) of configurations already installed. A drawing to your exact warehouse dimensions is sent free with the quote.





Safety accessories and installation
| Accessory | Unit | Price (excl. 8 % VAT) |
|---|---|---|
| Heavy-duty upright protector, 300 H × 130 L × 100 W mm | pc | VND 170,000 |
| End-of-aisle guard rail, 300 H × 1,000 L mm | pc | VND 460,000 |
| Row spacer, 200 mm | pc | VND 20,000 |
General specifications
| Item | Value |
|---|---|
| Steel | JIS-standard steel sheet, roll-formed; omega uprights punched at 50 mm pitch, level spacing adjustable without special tools |
| Finish | Oxyplast (Belgium) powder coating, standard warehouse blue–orange; other colours to order |
| Assembly | Bolted structure, beam safety clips easy to remove; base plates anchored to the concrete floor |
| Load | Evenly distributed on 2 beams; heavy-duty 1,000–1,200 kg/level (2 pallets 1,000×1,200 mm), medium-duty 200–300 kg/level |
| Decking | 17 mm plywood (2440×1220), 0.5–0.7 mm steel deck, or open for pallets; ESD mat available for electronic component stores |
| Lead time | Small orders 2–3 weeks after drawing approval; projects over 100 bays about 25 working days production + 3–4 days installation |
| Warranty | Frame 3 years; ESD shelf surfaces, electrical fittings and casters 12 months |
| Payment | 40–50 % deposit on signing, balance on acceptance; 8 % VAT invoice (0 % for export processing enterprises) |
How is the price of heavy-duty racking calculated?
Racks are sold per bay. One row = 1 starter bay + n add-on bays (a 10-bay row = 1 starter + 9 add-ons). Price varies with height, number of levels, load, decking and quantity; the table above lists 6 configurations already produced so you can estimate quickly. Example, a 10-bay row of 4-level heavy-duty racking with plywood decks: 1 × VND 5,720,000 + 9 × VND 5,010,000 = VND 50,810,000 excl. VAT, installation included.
For PRIMEAG to draw the layout and count the bays, send 5 things via Zalo or email: (1) warehouse plan – dimensions, column positions, doors; (2) clear height under the ceiling; (3) pallet size and weight; (4) forklift type and maximum lift height; (5) desired aisle width.
Reading the load notice correctly
A load notice carries two figures: load per beam level and bay load (all levels in one bay). Goods must satisfy both. Example: a 4-level bay at 1,000 kg per level has a bay load of 4,000 kg. PRIMEAG fits a load notice on every row at handover.
Mandatory safety where forklifts operate
- Upright protectors on every end-of-row upright and uprights next to forklift aisles; guard rails at main aisles.
- Anchor bolts in every base plate into the concrete floor; the floor must be level and load-bearing.
- Pallet back-stops where racks stand against walls or pedestrian aisles.
- Never let pallets overhang the beams; never exceed the load on the notice.
- Inspect bent or dented uprights after any impact; replace immediately, never prop them up.
Frequently asked questions
How many kg can heavy-duty warehouse racking carry?
PRIMEAG selective pallet racks carry 1,000 kg/level with 60×90×1.5 mm omega uprights and 50×100 mm beams; 1,200 kg/level with 60×90×1.7 mm uprights and 50×120 mm beams. Each level holds 2 pallets of 1,000×1,200 mm. Loads are calculated for the actual goods of each warehouse.
How much does heavy-duty racking cost?
From VND 4,240,000 per starter bay and VND 3,170,000 per add-on bay (2-level, 4.5 m high pallet rack); 4-level racks with plywood decks from VND 5,010,000 per add-on bay. Prices include delivery and installation, excl. 8 % VAT.
How much does medium-duty shelving cost?
From VND 2,800,000 per bay (4 levels, 2,000×1,550×600 mm, 300 kg/level); 9-level, 2.6 m high shelving from VND 5,400,000 per bay. Excl. 8 % VAT, installation included.
How long does pallet racking take?
Small orders 2–3 weeks after drawing approval; projects over 100 bays about 25 working days production and 3–4 days installation at warehouses in Ho Chi Minh City, Binh Duong, Dong Nai and Long An.
Is delivery and installation charged?
Not for orders from VND 20 million in Ho Chi Minh City, Binh Duong, Dong Nai and Long An. Smaller orders or more distant provinces are quoted with a separate fee.
Medium-duty vs heavy-duty – what is the difference?
Medium-duty shelving has 60×50 mm uprights and 30×80 mm beams, carries 200–300 kg/level and is hand-picked, for cartons and component reels; heavy-duty racking has 60×90 mm omega uprights and 50×100–120 mm beams, carries 1,000–1,200 kg/level and is served by forklift.
Get a quote with layout drawingSee the pallet racking product page
Updated: 24 Oct 2026 — PRIMEAG engineering team
